Family-owned since 2001 · Monmouth & Ocean County
Lic. # 13VH098868007 Brook Dr, Ocean Township, NJ 07712(732) 333-7800
Bright modern bathroom with a shower, toilet, and vanity in neutral tones.
Plumbing · Monmouth & Ocean County, NJ

Shower and Tub

Valves, traps, and surrounds that do not leak into the ceiling below. We do this across Monmouth and Ocean County from Ocean Township. Call and we come look before we write the scope.

  • 5.0 on Google
  • Licensed #13VH09886800
  • Phone answered 24/7
Shower and Tub

Shower and Tub, on one written scope.

Valves, traps, and surrounds that do not leak into the ceiling below.

16Plumbing services
24/7answered by phone
Freeon-site look
Lic#13VH09886800
This visitValve replacementTub swapsShower heads and armsAccess when the wall has to open
Home repair project photo
On-site scope

What’s included on a shower and tub visit.

Valve replacement
Tub swaps
Shower heads and arms
Access when the wall has to open
How the estimate works Free on-site look. Written scope before work starts.

We inspect the cause, check what else it touched, and leave a written scope with materials and timing. The visit is free and there is no obligation to book the work.

Call (732) 333-7800
Shower and Tub

What to know before the visit.

Have ready

Clear everything out of the tub and the surround, take down the shower curtain or door, and empty the cabinet under the vanity if the work reaches it. Tell the technician if you have seen water stains on the ceiling below or on a neighboring wall. The technician checks three things first: the valve brand and the handle center spacing, because that decides whether the cartridge can be replaced or the valve body has to come out, the condition of the tub floor and the drain, and whether there is any access from behind the wall.

  • Valve replacement
  • Tub swaps
  • Shower heads and arms
  • Access when the wall has to open

The visit

A valve replacement is planned around whether we can reach it from the back. If the only access is the tile, the tile repair is part of the scope before we open anything. Tubs get set level and bedded. The overflow and the trap are tested before the skirt or the tile closes them in.

A tub-to-tile joint caulked five times is leaking. The ceiling below is the evidence. We open the wet side, replace what is soft, and reset the joint in a material that can move.

Permit

Changing a shower head, a spout, or a trim kit is a fixture swap in the same location, so a town does not permit it and no inspection happens. Replacing the valve body or moving the drain is plumbing work that goes to the town, and the rough inspection has to occur while the wall is still open. A new tub on the existing rough-in usually rides with that same plumbing permit. The access opening is kept available until the inspection is done.

On the Shore

Two things fail early in a shore bathroom. Salt air pits the valve cartridge and the chrome, so the handle gets stiff and then drips. Damp air in a closed bathroom keeps the wall cavity wet, and the freeze-thaw swing moves the tub and the tile at different rates, which is why the caulk joint at the tub line opens again and again. That joint gets a flexible, mold-resistant sealant rather than grout, and the wall behind the surround gets a waterproofing layer, not just a moisture-resistant board.

When we leave

The valve is run on hot and cold, the shower head and the spout are checked for flow, and the tub is filled to the overflow to confirm the gasket and drain hold. The trap and ceiling below are watched. After that the access is closed or left as a panel. The care note is to wait about a day before using the shower if sealant was applied, and not to stand on a new tub apron or a surround edge, because those are not meant to carry weight.

Built with

The materials are a thermostatic or pressure-balance valve with a matching trim kit, PEX or copper supply lines, PVC or ABS waste fittings, and a tub drain with an overflow gasket. The surround gets a waterproof backer board with a bonded sheet membrane or a coated board at the wet area. The wall joint at the tub gets a flexible sealant that can take movement. The valve is chosen so the handle stops at a safe temperature instead of running full hot.

FAQ

Shower and Tub questions

Have another question? Call (732) 333-7800 anytime.

Can you replace a tub without retiling the whole bath?

Sometimes, if the surround comes out clean and the valve can stay. A cast-iron tub that has to be broken out often takes the wall with it, and we say that up front.

One-piece surround?

We measure the alcove, including out-of-plumb walls. A surround forced into a tight alcove buckles.

Do you set a freestanding tub?

Yes, with the drain rough-in exactly where the tub wants it, and the floor structured for the weight when it is full of water.

A shower door after the tile?

We measure after the tile is in, not from the old opening. Doors ordered early do not fit.

Anti-scald valve?

If we are replacing the valve, it is a pressure-balance or thermostatic valve, not a two-handle that can go full hot. That is the current requirement and it is the safer install.

How do you test?

The valve is on, the spout is capped or the head is running, and we watch the access or the ceiling below. Then we close the wall.

Can you replace just the cartridge?

Sometimes, if the valve body is sound and the replacement parts are still made for it. A valve that is corroded or no longer supported gets replaced, because a new cartridge in a pitted body drips again in a season. The handle spacing tells you which case it is.

Why does the caulk at the tub keep failing?

The tub and the tile move at different rates as the room heats and cools, so a rigid joint cracks. The old material has to come out and the joint reset in a flexible sealant. Caulking over the top of a failed joint hides it for a few months.

Do you have to open the wall?

Only if there is no access from behind and the valve has to be replaced. If a closet or a hallway wall backs the shower, that is opened and later repaired. If the only access is through the tile, that repair is discussed and agreed before anything is cut.

How do you check for a leak before closing up?

The valve runs, the tub fills to the overflow, and the drain is cycled while the technician watches the trap and the ceiling below. Nothing gets closed until that test is dry. A slow weep shows in the first minutes if you look in the right place.

Call 24/7 · Free on-site look

Tell us what is wrong. We will tell you what it takes.

(732) 333-7800
  • Call24 hours a day, 7 days a week
  • Shop7 Brook Dr, Ocean Township, NJ 07712
  • EmailInfo@wedoitallhandyman.com
  • EstimateFree on-site look. Written scope before work starts.

Licensed & insured · NJ HIC # 13VH09886800
Free on-site look · No obligation

Request a free estimate

We will call to schedule a free on-site look. No obligation. By submitting you agree to our privacy policy.

Thanks — we will call you back shortly. For anything leaking or sparking, call (732) 333-7800 now.

Call (732) 333-7800Free estimate